1 ECN
Ecn should be issued when modifying drawing,Copy children BOM of subassembly from BIL if one ECN/ECO introduce new subassembly per NPIEngineer /Planner's requirement,Create Cost table for scrapped part and rework parts after ECN implementation, lead old revision partsrework or scrap issue.New product and ECN evaluation and relevant solution implement.Ensure that the cost changes due to ECN's are updated in the cost sheets at the appropriate time。
2product specification
As show in the photography.
System Configuration / Functional Block Descriptions 系统配置 、功能说明
Wiring Diagram 连接图
Schematic Drawing 原理图
BoM 元器件清单
Gerber File 你懂的
Critical Signal Flow Description and Margin Test Plan
Functions Description
Reliability Test Requirements
Safety and Compliance Requirements
PCB DFM Issues
3 cypress nstall “PSoreatorSetup_4.0_es100_b432”
SysConfiguration / Functional Block Descriptions |
Wiring Diagram |
Schematic Drawing |
BoM |
Gerber File |
Critical Signal Flow Description and Margin Test Plan |
Functions Description |
Reliability Test Requirements |
Safety and Compliance Requirements |
PCB DFM Issues |